Flag of Indiaसत्यमेव जयते AADTAK
GOOD INDIA GUJARAT

Powering India’s High-Speed Dream: 50-Km Surat–Bilimora Bullet Train Stretch Energised

India’s flagship high-speed rail project crossed a critical engineering threshold on November 20, 2026, with the successful energisation of the Overhead Equipment (OHE) system along the 50-kilometre Surat–Bilimora section of the Mumbai–Ahme

Pragativadi Sat, 21 Nov 2026 15:46
Pragativadi पर मूल खबर पढ़ें ↗