GOOD
INDIA
GUJARAT
Powering India’s High-Speed Dream: 50-Km Surat–Bilimora Bullet Train Stretch Energised
India’s flagship high-speed rail project crossed a critical engineering threshold on November 20, 2026, with the successful energisation of the Overhead Equipment (OHE) system along the 50-kilometre Surat–Bilimora section of the Mumbai–Ahme
Read the original at Pragativadi ↗