GOOD
POLITICS
PUDUCHERRY
Puducherry seeks 50 MW additional power from central power grid

In a memorandum to the Union Minister, Namassivayam said the Union Territory has General Network Access to the Inter-State Transmission System for 540 MW of electricity. The territory’s requirements during peak hours in 2026-27 had reached
Read the original at The Hindu · Puducherry ↗