GOOD
INDIA
WEST BENGAL
KMC, Sealdah Railway Division join hands for pipeline repair as water woes persist in Kolkata’s Tala

Over five million gallons of water have leaked after the 72-inch pipeline suffered damages on November 9, 2026 morning; the line also ran under the railway track, disrupting train services
Read the original at The Hindu · Kolkata ↗