GOOD
INDIA
GUJARAT
First section of Mumbai-Ahmedabad bullet train project to get powered up on November 20

With the energisation of the first section, which is between Surat and Bilimora, electrical current will flow through the Up and Down lines on the elevated corridor, officials said
Read the original at The Hindu ↗