GOOD
INDIA
DELHI-NCR
4.5 km Delhi railway drain project sees 19% cost jump in 5 months

The covered trunk drain is supposed to resolve the drainage problem of four adjoining areas — Kirari, Mundka, Bawana and Nagloi.
Read the original at HT · Delhi ↗